Home>News>China corten a material equivalent Price Trends Graph

China corten a material equivalent Price Trends Graph

Pageviews:

corten a material equivalent product plate production process:Raw materials (scrap steel, pig iron and molten iron) → electric furnace (100 tons electric arc furnace smelting) → converter → LF furnace molten steel refining treatment → VD or VOD furnace molten steel vacuum treatment → die casting (various key die casting lines) or continuous casting (large Slab caster) (50 tons of slab electroslag furnace for remelting a steel ingot) → heating (continuous furnace and soaking furnace) → steel plate rolling (4100 and 4200mm rolling mills) → steel plate heat treatment (normalizing and tempering) Quality) →Steel plate cutting inspection→Inspection

BBN steel corten a material equivalent 15mm to 35mm thick size: 15*2120*5620, 17.5*2320*13000, 18*2450*5500, 20*3000*5000, 19*2580*4700, 19.5*1970*4000, 20*1600*7740, 20.5*2370*7000, 21*2650*7500, 21*1920*8220, 22*1380*7650, 22*1800*8000, 22.5*1680*8450, 23*3000*11980, 23.5*2080*8100, 24*1560*6200, 25.5*2330*8300, 26*3010*8100, 26.5*2000*7000, 27*2550*6800, 27.5*2700*5500, 29*2550*9000, 29*2870*12000, 32*3300*6000, 33*2340*6700, 34*2120*6100, 35*1300*4100.

The tight supply of coal in Bohai Rim ports has eased, but high-calorie and low-sulfur coal is still in short supply; port resources are tight, traders are reluctant to sell at low prices, and the sentiment remains strong. Although the coal storage of key power plants is relatively high, the coal storage of coastal power plants is in the middle, and the enthusiasm for pulling transportation still exists. As the weather gradually turns colder, downstream power consumption increases, procurement demand continues to increase, and power plants release demand.

corten a material equivalent, Special thick steel plate cutting needs to be preheated in advance. Some steel plates are prone to cracks after entering the cutting process, sometimes that is because the temperature is too low, and it is necessary to perform pre-heat treatment in advance for such cases. The staff can preheat the steel plates first, so that the temperature of the steel plates will gradually increase, and then the flame gun can be used to cut. The probability of cracks in the cut material is very low, and the quality of the steel plate is also guaranteed.

Previous:The role of alloying elements in grade c
Next:corten a grade material prices may remai

Send us a message